Power on your timeline.
Sites need a lot of power, the grid can't deliver it in time, and often the equipment is back-ordered.
GPG delivers behind-the-meter BTM solutions that add value to your time to revenue.
One hand to shake, from concept to commissioning.
Book a Time-to-Power Assessment →
The grid can't keep up with your schedule.
2,200+ GW
of generation and storage waiting to connect to the U.S. grid. That's more than the entire installed U.S. fleet.
Source: Berkeley Lab, Queued Up 2026 Edition
52 to 80 weeks
for medium-voltage switchgear. 40 to 65 weeks for pad-mount transformers.
Source: 2026 contractor procurement data, Terrapin Construction Group
30 to 50%
of U.S. data center projects planned for 2026 are expected to slip, driven by power constraints and equipment shortages.
Source: Sightline Climate, 2026 Data Center Outlook
Every month you wait on the utility is a month without revenue.
BTM power doesn't make the site buildable, permittable or connectable. A design-build integrator solves exactly that.
GPG is the single point of accountability from concept to commissioning, or at any stage in between. We use our teams or yours, and we manage every contractor, vendor, utility and authority having jurisdiction so you don't have to.
Design | Engineering | Procurement | Permitting | Construction | Installation | Monitoring | Maintenance
Solutions
EV Charging
Class A buildings, Fleets, Parking Lots/Garages, for 1 or multiple sites. Level 2 and Level 3 Electric Vehicle Supply Equipment EVSE.
Data Centers
Bridge-to-grid power, switchgear, permitting and DCIM for 5 to 100 MW colocation, edge and AI/GPU sites. Energize before your utility interconnection lands.
Microgrids and Storage
Battery storage, solar, generation and microgrids for commercial and industrial sites facing demand charges, outages or long utility queues. Storage-first designs built around today's federal incentives.
Vertiport Power-Readiness
Power studies, megawatt charging and battery buffering for vertiports, airports and FBOs. Charger-neutral, built for Los Angeles and beyond.
From "can we get power?" to energized.
1. Assess (2 to 4 weeks). Our Time-to-Power Assessment answers three questions: can this site get power, how much, and when.
2. Design-build. We design, procure, permit, build and commission your behind-the-meter system as one accountable integrator.
3. Operate. Monitoring, maintenance and DCIM keep your site performing after the ribbon cutting.
Start with a Time-to-Power Assessment.
A paid, fixed-scope study delivered in 2 to 4 weeks. You get a clear answer on available power, timeline, equipment path and budget. 50% of the fee is credited toward design-build signed within 90 days.
Built for projects too complex for an electrician and too small for the large EPC firms.
Colocation and edge data center developers
AI and GPU tenants retrofitting existing buildings
Commercial and industrial sites: fleets, logistics, hospitals, manufacturing, parking, multifamily
Vertiport developers, airports and FBOs
Ports, transit agencies, school districts and municipalities
Engineering firms that need a builder or integrator
You sell the equipment. We make sure it gets installed and energized on time.
When your customer can't execute alone, send them to GPG. We handle design, permitting, interconnection and construction so your equipment ships, installs and energizes on schedule.
Get your site powered faster than the grid can.
Tell us about your site. We'll tell you whether an assessment makes sense.